Rigging the levelwind for extraction from the winch pit. Each piece of gear was meticulously secured to be moved carefully.
065 – Antarctica2014Slides – DSCN0367 – Donenfeld
–
–
Rigging the levelwind for extraction from the winch pit. Each piece of gear was meticulously secured to be moved carefully.
Leave a Reply
You must be logged in to post a comment.